Inside look at testing of new Metro rail cars - New York News

Inside look at testing of new Metro rail cars

Posted: Updated:
WASHINGTON -

A fleet of new Metro rail cars is on order. But before they can hit the tracks, the new 7000-series trains must put in thousands of hours on the tracks and undergo a battery of tests.

It's an around-the-clock operation to test the new rail cars. While out on the tracks at night, the four-car train is pushed to the max.

"We'll run from about 12:30 to 4 o'clock in the morning,” said Joseph Reynolds, the chief of Metro’s Vehicle Program Services.

Then every inch is inspected by day. Reynolds gave FOX 5 a first-hand look at how it's done. Everything inside and out goes through the ringer.

"That's what I usually do – I try to break things to make sure that it's passenger proof,” Reynolds said laughingly.

Things such as electronic screens on the train.

"Hitting it with sharp objects to see how it reacts or kicking it,” said Reynolds.

For the windows, Reynolds said, "They will shoot an object to make sure it won't break.”

A computer wired to the control systems monitors every move -- from 0 to 75 miles per hour. Since the trains can't carry passengers, solid metal blocks inside the rail cars do the job.

But if real passengers were on the train, they surely would have complaints about one problem uncovered in the testing: the trains were too tightly sealed. Poor air circulation means it could get stuffy. But that has been fixed.

The cars were built with passengers in mind. The aisles are wider. The seats have lumbar support. There is even a cutout on the back of chairs to give you more leg room and it is open underneath to stash your belongings.

But can those seats stand up to the wear and tear as well as bumps and spills?

“They have equipment that will simulate someone sitting over and over again onto the car,” said Reynolds.

What about weathering a deep freeze?

"Part of the design was to operate at -30 degrees,” he said.

And a sweltering summer day?

“We have designed equipment to withstand that kind of temperature or in excess of 120 degrees,” said Reynolds.

Can it ride out a snowstorm or downpour?

"We actually submerge the motor in water,” Reynolds said. “So you submerge the motor and you test it for insulation."

Once Metro signs off of the trains, they will ramp up production.

"By the end of the year, we will see these cars in service,” Reynolds said.

  • Local NewsLocal NewsMore>>

  • 'Get on Up' and James Brown's Harlem legacy

    'Get on Up' and James Brown's Harlem legacy

    Friday, August 1 2014 5:55 PM EDT2014-08-01 21:55:13 GMT
    "Get on Up" is in theaters now. The film chronicles the career of James Brown, who had a special connection to Harlem and New York. Billy Mitchell is the in-house historian at the historic Apollo Theater. He says the Apollo was a second home to Brown, as it was here where he became an international superstar who appealed to all. But Brown's NYC legacy stretches even further.
    "Get on Up" is in theaters now. The film chronicles the career of James Brown, who had a special connection to Harlem and New York. Billy Mitchell is the in-house historian at the historic Apollo Theater. He says the Apollo was a second home to Brown, as it was here where he became an international superstar who appealed to all. But Brown's NYC legacy stretches even further.
  • Dog found in abandoned home cleaned up and adopted

    Dog found in abandoned home cleaned up and adopted

    Friday, August 1 2014 5:51 PM EDT2014-08-01 21:51:00 GMT
    A 6-year-old Shih Tzu mix that was found in an abandoned home in Lindenhurst two weeks ago now has a new home with a new family. Ziggy has been has been cleaned up and has undergone physical therapy. Babylon town employees took three and a half hours to remove nearly four pounds of matted hair after they found him. Ziggy's fur was so matted and his nails so overgrown that he could barely walk.
    A 6-year-old Shih Tzu mix that was found in an abandoned home in Lindenhurst two weeks ago now has a new home with a new family. Ziggy has been has been cleaned up and has undergone physical therapy. Babylon town employees took three and a half hours to remove nearly four pounds of matted hair after they found him. Ziggy's fur was so matted and his nails so overgrown that he could barely walk.
  • Massive emergency drill in New York City

    Massive emergency drill in New York City

    Friday, August 1 2014 5:14 PM EDT2014-08-01 21:14:45 GMT
    The New York City Department of Health conducted a massive emergency preparedness drill at 30 facilities across the city on Friday. They tested the delivery of emergency medications in the event of a biological attack, such as anthrax, or other large-scale public health emergency in the city. The majority of the deliveries will take place to public school buildings.
    The New York City Department of Health conducted a massive emergency preparedness drill at 30 facilities across the city on Friday. They tested the delivery of emergency medications in the event of a biological attack, such as anthrax, or other large-scale public health emergency in the city. The majority of the deliveries will take place to public school buildings.

Powered by WorldNow
Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | New Terms of Service What's new | Ad Choices